TENESO Spain, specialists in “final mile” distribution in Iberia were selected by Fagor Industrial to carry out the logistics and installation of catering equipment into the new stadium of Atletico de Madrid, the Wanda Metropolitano. TENESO Spain managed the whole operation from the reception and handling of a large volume of trucks from suppliers to warehousing more than 1,200 packages, order fulfilment together with the transportation and positioning of the equipment into the stadium using specialist vehicles, cranes and stair robots
Although TENESO Spain already collaborates with Fagor Industrial on a ‘day to day’ basis, this operation was different since it involved such an intense and large volume of equipment over a sustained but short period of time. Patxi Latorre, commercial director of TENESO Spain said, “Our ability to effectively manage the whole logistics process and to meet Fagor’s specific needs were the differentiating factor that led Fagor to place its trust in us”
Miguel Diaz, managing director added, “We were very pleased to have had the confidence of a first-class company like Fagor to let us carry out this operation for them. We were able to prove to them first-hand the efficiency, reliability and quality of our logistics services”.
Javier Sánchez, sales director of Fagor Industrial adds, “This was a major high profile delivery for us and for atletico madrid. Having worked with TENESO Spain before gave us the confidence to know that the project would run seamlessly and they did not let us down”